Gross floor area: 1.262 m2 2 floors construction time: 4 months
In the centre of Vienna, three temporary buildings were established to serve as substitute accommodations during the restauration of the austrian parliament. The assembly started on Octobre 17th 2016 and took only six months. The gross floor area of the project is 11.000 m2. The Lukas Lang Building System was used in combination with a massive core construction that was provided by Strabag AG. After the restauration of the austrian parliament, the temporary buildings will be disassembled and reused.
Gross floor area: 653m2 2 floors construction time: 2 months.
64 estates floor space per estate: 100 m2 construction time: 4 weeks
Gross floor area: 1.193m2 2 floors construction time: 4 months
Gross floor area: 430 m² 1 floor construction time: 5 weeks